This is Ritsu Sakakibara. I will give the conclusion first.
The obligation to conform to the energy efficiency standards that began in April 2025 is an obligation placed on the building owner (kenchikunushi) when a building is newly built, extended or reconstructed. Simply continuing to use, rent out or sell an existing apartment building does not trigger this obligation. There is also no provision requiring an existing building that does not meet the standards to be renovated to meet them. If you extend or reconstruct, the part being extended or reconstructed must conform to the standards.
What is decided, and how
The basis is the Act on the Improvement of Energy Consumption Performance of Buildings (Act No. 53 of 2015 (Heisei 27), commonly called the Building Energy Efficiency Act).
- When a building owner intends to construct a building (excluding those at or below a size set by Cabinet Order), the owner must make that building conform to the building energy consumption performance standards (commonly called the energy efficiency standards). In the case of an extension or reconstruction, the part being extended or reconstructed is covered (Act Article 10, paragraph 1).
- This provision is deemed a building standards-related provision and is examined in building confirmation (kenchiku kakunin) (Act Article 10, paragraph 2).
- The excluded size is set by Cabinet Order as a floor area of 10㎡ or less.
- Through the amendment by Act No. 69 of 2022 (Reiwa 4), it applies to buildings whose construction started in or after April 2025 (Reiwa 7). Construction starts at the point when piling, ground improvement, earth retaining or excavation work begins. Until then, the obligation to conform covered medium- and large-scale (floor area of 300㎡ or more) non-residential buildings.
What to compare
| Action | Obligation to conform to the energy efficiency standards | Basis |
|---|---|---|
| Continuing to use, renting out or selling the current building | Does not apply | Act Article 10, paragraph 1 (an obligation when intending to construct) |
| Repair or remodeling (including major repair and major remodeling) | Does not apply | MLIT Q&A collection 1-2 Q1 and Q2 |
| Only replacing equipment such as air conditioning (where it does not count as new construction, extension or reconstruction) | Does not apply | Same, 1-1 Q19 |
| Change of use (where it does not count as new construction, extension or reconstruction) | Does not apply | Same, 1-1 Q20 |
| Extension or reconstruction (floor area of the extended or reconstructed part over 10㎡) | The part being extended or reconstructed must conform | Act Article 10, paragraph 1; same, 1-2 Q3 (shown as the case where the whole building after the extension or reconstruction falls under Building Standards Act Article 6, paragraph 1, items 1 and 2) |
| Rebuilding (new construction) | The whole building must conform | Act Article 10, paragraph 1 |
Even if repair or remodeling is outside the energy efficiency standards, that does not mean building confirmation is not required. After the revision of the Building Standards Act in force from April 2025, buildings with two or more stories or with a total floor area over 200㎡ are subject to building confirmation and inspection even for major repair or major remodeling (same, Building Standards Act section 2 Q1). A 2-story wooden apartment building falls under this. Apartment buildings where the floor area used for that purpose exceeds 200㎡ were covered before the revision, and what the revision newly brought in is mainly smaller wooden buildings. This is an easily overlooked point.
Where the answer splits
Whether the obligation applies is decided by the following 3 points.
- Whether the work counts as new construction, extension or reconstruction (if it is only repair, remodeling, equipment replacement or change of use, it does not)
- For an extension or reconstruction, whether the floor area of that part exceeds 10㎡
- Whether construction started in or after April 2025 (Reiwa 7)
The following is an assumption for illustration. Take a 2-story wooden apartment building with a total floor area of 240㎡.
| Work | Scope that must conform to the energy efficiency standards |
|---|---|
| Renovating the outer walls or roof (repair or remodeling) | None (check separately whether building confirmation is required) |
| Adding a 30㎡ unit on the 1st floor | The 30㎡ part being added |
| Demolishing and building new | The whole new building |
Labeling when renting out or selling
The system for showing energy efficiency performance in sales and rental advertising (the energy efficiency performance labeling system for the sale and rental of buildings) is a duty to make efforts for sellers and lessors in the business. It covers buildings for which building confirmation was applied for in or after April 2024 (Reiwa 6). For existing buildings for which confirmation was applied for before that, and whose energy efficiency performance is hard to determine, labeling in the form set by the notice is not uniformly required. Where the performance is known, labeling in the form set by the notice is said to be desirable (same, labeling system Q4 and Q12). MLIT recommends labeling existing buildings too, but says not labeling does not make one subject to a recommendation or the like. For existing housing, an "energy efficiency component label," which shows the components that have had energy efficiency renovations such as windows and water heaters, has been in use since November 2024.
Conditions behind the numbers
- This is based on the laws and regulations as of November 2026 and MLIT's Q&A collection (as of November 2, 2026 (Reiwa 8)).
- The Act has a provision that building owners and others shall also endeavor to improve energy efficiency performance (Act Article 6, paragraph 2), and the national basic policy (MLIT Notice No. 971 of 2023 (Reiwa 5)) sets out the measures owners and others should take. It is a duty-to-make-efforts provision, not a provision ordering renovation.
- Whether an extension or reconstruction requires the energy efficiency conformity assessment procedure also depends on the size of the building after the extension or reconstruction. Individual cases are judged by the designated administrative agency or a designated confirmation and inspection body.
Order of checks
- Write down whether your plan for the next 10 years or so includes an extension or rebuilding.
- Sort the planned work into new construction, extension or reconstruction versus repair or remodeling.
- For an extension, check the floor area of the added part and the planned construction start date.
- Even for repair or remodeling, check from the building's number of stories and total floor area whether building confirmation is required.
- If you plan to rent out or sell, gather the specifications you know, such as windows and water heaters, and the records of renovations.
From here on, this is my opinion
For existing apartment buildings, I do not think there is any need to rush into energy efficiency renovations on the grounds of the conformity obligation. It is reasonable to decide whether to renovate by whether the effect on utility costs and on how easily units are let justifies the cost. On the other hand, if your plan includes rebuilding or an extension, I think the cost estimate should include the amount needed to conform to the standards.
Sources (in Japanese)
- e-Gov法令検索(デジタル庁)「建築物のエネルギー消費性能の向上等に関する法律」(checked 2026-11-16)
- 国土交通省「脱炭素社会の実現に資するための建築物のエネルギー消費性能の向上に関する法律等の一部を改正する法律(令和4年法律第69号)に係る質疑応答集(令和8年11月2日時点)」(checked 2026-11-16)
- 国土交通省「建築物省エネ法に基づく建築物の販売・賃貸時の省エネ性能表示制度」(checked 2026-11-16)
- 国土交通省「改正建築物省エネ法・建築基準法等に関する解説資料とQ&A」(checked 2026-11-16)