This is Ritsu Sakakibara. I will give the conclusion first.
No. The mark for existing homes based on a notice of the Ministry of Land, Infrastructure, Transport and Tourism (a logo mark whose system name carries "R Jūtaku"; the official name of the system is the Registration System for Organizations of Business Operators Providing Information on Specified Existing Homes) is not something the government examines unit by unit to vouch for quality. The Q&A on the Ministry's page for the system describes this mark as something that, under the responsibility of the members (member companies) of a business organization registered by the government, "indicates conformity with the requirements set by the government", and states that it "has not undergone individual examination by the government".
What is decided, and how
The basis is the Registration Rules for Organizations of Business Operators Providing Information on Specified Existing Homes (MLIT Notice No. 1013 of 2017 (Heisei 29)). It is a notice, not a law, and on the e-Gov public comment page the field for the underlying statutory provision is also "-". The mechanism is as follows.
- The Minister of Land, Infrastructure, Transport and Tourism registers general incorporated associations and similar bodies as organizations
- The Minister licenses the registered organizations to use the mark
- A registered organization lets only members who meet the requirements use the mark
- A business operator that is a member indicates, under its own responsibility, that the home meets the requirements
The Ministry's page for the system states that a home whose mark does not show the name of a registered organization alongside it is not a covered home.
What to compare
Organized from the Q&A on the system page, the Ministry's Q&A collection for the system (as of April 1, 2026 (Reiwa 8)) and the outline of the amendment, it looks like this.
| Item | What is required | What the mark does not tell you |
|---|---|---|
| Earthquake resistance | Conforms to the new earthquake-resistance standards, etc. | ― |
| Structure and rain leaks | An inspection (building condition survey, etc.) finds no structural defects or rain leaks (or, if found, repairs are completed by the time of advertising), and the home meets the inspection standards of existing-home sale defect insurance | ― |
| Laws and regulations | Not clearly in violation of building-standards-related laws and regulations, etc. | Conformity with current building-standards-related laws and regulations, etc. (the Q&A on the system page states clearly that this is not assured) |
| Ground | ― | Uneven ground settlement in the future, liquefaction after an earthquake (same as above) |
| Water supply and drainage, termites | ― | The Q&A on the system page treats these as the field of specialist survey companies, etc. |
| Renovation | Completed, or a renovation proposal has been prepared | Whether the work will be carried out as in the proposal (the amendment outline also says it "is not necessarily carried out") |
| Records | Information is provided on how inspection records, etc. are kept | The contents of the records themselves |
What is easily overlooked is that this mark is not a performance grade. The Q&A collection for the system draws a distinction: the Housing Performance Indication System shows performance such as "Seismic Grade 3", whereas this mark does not indicate performance but is attached to homes that have a certain level of quality.
Where the answer splits
On November 2, 2026, the Ministry began inviting public comments on a draft amendment to this notice (the deadline is 23:59 on December 3, 2026). The amendment outline says it will relax 2 points, on the grounds that the gap between the requirements and business practice in existing-home sales is a barrier to using the system.
| Requirement | Current | Draft amendment |
|---|---|---|
| Renovation (Article 10, Paragraph 2, Item 1 (c)) | Renovation work carried out, or a proposal prepared | Also acceptable: a promise to prepare a proposal by the time the sale contract is concluded |
| Photos (Article 10, Paragraph 2, Item 3) | Photos, etc. of the current state of the exterior, main interior, kitchen, bathroom, toilet and washbasin are made available for the buyer to view | If the owner's consent to taking them or making them available for viewing cannot be obtained, they need not be made available |
If the draft goes through as is, there could be homes with the mark that have no proposal yet at the time you are considering them, or whose exterior, interior and wet areas you cannot see in photos. "Renovated", "proposal available" and "promise to prepare a proposal" may be treated the same under the mark, but the amount of information in the buyer's hands differs.
Conditions behind the numbers
- The Q&A collection for the system is the edition as of April 1, 2026 (Reiwa 8).
- As of November 4, 2026, the amendment is at the draft stage. The effective date is not consistent across the materials: February 1, 2027 (Reiwa 9) in the amendment outline, and January 1, 2027 (Reiwa 9) in the supplementary provisions of the draft notice. It needs to be checked in the finalized notice.
- Only business operators that are members of a registered organization and are allowed by that organization to use the mark can use it. The absence of the mark does not mean the home fails to meet the requirements.
Order of checks
- Look at whether the name of a registered organization is shown alongside the mark, and check that organization in the Ministry's register
- Ask to see the written inspection results (any of: the summary of the building condition survey results, the inspection report, or the certificate of conformity with the inspection for existing-home sale defect insurance), and check the date and scope of the survey
- Check whether the renovation is "completed", "proposal available" or "promised to prepare a proposal", and if there is a proposal, read what it says about costs
- If you cannot view photos, look at the exterior, interior and wet areas yourself at the viewing
- Treat the ground, water supply and drainage, and termites as outside the scope of the mark, and investigate them separately
From here on, this is my opinion
I think it is best to read this mark not as a quality assurance but as an indication that a certain set of information is in place. Since the draft amendment moves toward relaxing how complete that information must be, I think the weight shifts from whether the mark is there to checking the contents of the documents that reach you. When the finalized notice is issued, I will review the conditions of this answer.
Sources (in Japanese)
- 国土交通省(e-Govパブリック・コメント)「特定既存住宅情報提供事業者団体登録規程の一部を改正する告示案に関する意見募集について」(checked 2026-11-04)
- 国土交通省「特定既存住宅情報提供事業者団体登録規程の一部を改正する告示案について(改正概要)」(checked 2026-11-04)
- 国土交通省「特定既存住宅情報提供事業者団体登録規程の一部を改正する告示案(別紙)」(checked 2026-11-04)
- 国土交通省「特定既存住宅情報提供事業者団体登録制度に関するQ&A集(令和8年4月1日現在)」(checked 2026-11-04)
- 国土交通省「特定既存住宅情報提供事業者団体登録制度(制度の案内とQ&A)」(checked 2026-11-04)