Yeah yeah, it's Rita. Wait, what is this? You've been dutifully paying into the repair reserve fund every month, and one day a notice arrives: "a lump sum for major repairs of several hundred thousand yen per unit." I've been paying, so why again? That's how you feel, right? But this isn't an accident. It's the result of a calculation.
Let's go back to the formula. If the money needed for major repairs is the construction cost, then construction cost = amount saved so far + borrowing + lump sum. The left side is decided by the building. Outer walls, rooftop, pipes — not even ¥1 of it gets cheaper by how you design the payments. If the savings on the right side are thin, the only way to fill the remaining hole is borrowing or a lump sum. That's all it is.
Let's use assumed numbers. In a building of 50 units, if the construction cost is ¥150 million and the reserve balance is ¥100 million, the hole is ¥50 million. Assuming every unit has the same share, ¥50 million ÷ 50 units is ¥1 million per unit. If the monthly contribution had been set ¥5,000 lower per unit, that's ¥250,000 a month across 50 units, and ¥36 million over 12 years. So a good part of the hole is the amount by which the monthly figure was made to look cheap.
Well? Does that pay off? Someone who thought they were saving ¥5,000 a month saves ¥720,000 over 12 years, and then one day gets asked for ¥1 million all at once. I mean, not all of the hole is the monthly figure's fault. Part of it is the construction cost itself swelling. That's right, nobody's to blame for that part. But in the formula, both flow into the same "not enough." Being pleased that it's cheap by looking only at the monthly figure is like choosing turnips only by how green the leaves are. You don't know how thick the root is until you pull it out of the soil.
Now the real point. The cheap monthly amount at the time of new construction is often part of a stepped-increase plan that raises it every few years. In June 2024 (Reiwa 6), the Ministry of Land, Infrastructure, Transport and Tourism added to its guidelines the idea that, taking the monthly amount under equal contributions as the reference amount, the first amount in a plan should be at least 0.6 times the reference amount and the last amount within 1.1 times. Flip that around, and plans from before then could have had sloppy designs where the first amount didn't even reach 60% of the reference. On top of that, if the increase is voted down at the general meeting in the year it was scheduled, the plan's numbers only remain on paper. You said earlier it was "the result of a calculation"? Right — and what throws that calculation off is usually a majority vote. Are you keeping up?
So what should a buyer look at? Fill in the right side of the formula yourself before you buy. The estimated construction cost of the next major repairs in the long-term repair plan, the current reserve balance, and the amount scheduled to build up by then. Subtract with these three and see whether a hole remains. If one does, that hole multiplied by your share ratio is a rough estimate of a future lump sum. Honestly, if you check the minutes for whether past increases went through as scheduled, you can also see how far the numbers on the right side can be relied on. See, it's coming into view?
Fragrant olive, you know — by the time you notice the scent it's already in full bloom, and nobody looks at it in the bud stage. A lump sum too, by the time you notice it from the notice, has already been decided at the general meeting. Let's look at the branch before it smells, meaning the plan and the balance.