BENERU
Law, contracts and systemsPublished

What is required when buying or selling land or buildings in a "special monitoring zone"?

BENERU writes for readers who live in Japan. Taxes, loans and the other rules described here are those of Japan, and they assume a resident of Japan.
This page is a translation of the Japanese original. If the two differ, the Japanese original prevails.

2 people have answered. Each answerer sees it differently.

RitaSharp-tongued debugger

Yeah yeah, it's Rita.

The way you ask "what is required?" already has the look of someone half reading it as "a permit is required," right? No, I get what you mean. The state designates zones and even draws lines on a map. Then the inside looks like a place where buying and selling needs the state's stamp.

Let me give the answer first. What's required isn't a permit, it's a notification. And it's before the contract, from both the selling side and the buying side. The threshold is 200 m² or more, and even a single condominium unit can fall within scope depending on how you count.

Let's sort it out once. There are 3 assumptions around this question.

The first is "once you're in a zone, you can't sell." The Cabinet Office FAQ says this law doesn't regulate transactions in land and the like, and that if you notify properly, it's fine to sign the contract. What gets stopped isn't the transaction, it's the person who signs a contract without notifying. If you sign without notifying, you can face imprisonment of up to 6 months or a fine of up to ¥1 million.

The second is "only the buying side notifies." The subject of the provision is "the parties," and the Cabinet Office writes that it's both the seller and the buyer. The selling side also has a document to submit in its own name. Get it?

The third is "you can submit it after the contract." The opposite. The provision says "in advance." If you mail it, it has to reach the Cabinet Office by the day before the planned contract date. There are exceptions, like mediation or auctions, where you submit within 2 weeks after the contract, but an ordinary sale isn't one of those.

So, here's where people trip up the most. The one line "200 m² or more." We read sentences by cutting them into units, so it bugs us that the single word "area" has 3 kinds packed into it: land, buildings, and sectional units.

Land is per parcel. Buildings are the floor area per building (the total of each floor, including annexed buildings). For a condominium unit, it's the floor area of the exclusive area, and common areas aren't added. Reading this far, you'd think a 25 m² studio unit has nothing to do with it, right?

But there's the way the land side is counted. If the total site area multiplied by that unit's site-right share comes to 200 m² or more, notification is still required. Say the site-right share is 50/10,000: with a 30,000 m² site that's 150 m², out of scope; with 40,000 m² it's exactly 200 m², in scope. Even with the unit staying small, at a housing complex with a large site it crosses the line. Deciding "this has nothing to do with us" from the unit's size alone is too early. Okay?

It's right, making the lines visible on a map to anyone. From October 28, 2026, the outer boundary lines of special monitoring zones were added to the Real Estate Information Library. But what the map tells you goes only as far as "inside or outside the line." How many m², who submits, by when: you have to count those yourself.

What to do is honestly plain stuff. Check on the map whether you're inside. Count the 200 m² with the registered land area and floor area and the site-right share (for land, use the latest survey if there is one). Before setting the contract date, set the notification date. If a brokerage firm is involved, this notification is also among the items in the explanation of important matters (jūyō jikō setsumei), so you can check it there too.

A reservation slip for New Year's Eve soba means something because you hand it in before New Year's Eve. Hand in the slip after you've finished eating, and it's just paper. Notification is the same: it's a notification because you submit it before the contract.

Ritsu SakakibaraFinancial product examiner

This is Ritsu Sakakibara. I will give the conclusion first.

When concluding a contract such as a sale for land or buildings of 200 square meters or more inside a special monitoring zone, both the seller and the buyer notify the Prime Minister (the contact point is the Cabinet Office) before concluding the contract. It is not a procedure for obtaining a permit. Concluding a contract without notifying carries penalties. Even a single condominium unit is in scope if the total site area multiplied by the site-right share is 200 square meters or more.

What is set and how

The basis is the so-called Important Land Survey Act (formal name: Act on the Review and Regulation of the Use of Real Estate Surrounding Important Facilities and on Remote Territorial Islands, Act No. 84 of 2021 (Reiwa 3)) and its enforcement order.

  1. Monitoring zones: designated by the Prime Minister from areas within roughly 1,000 meters around the sites of important facilities and areas within remote territorial islands and the like (Article 5, Paragraph 1 of the Act).
  2. Special monitoring zones: designated in cases such as where the important facility related to a monitoring zone is a specified important facility whose function is difficult for other important facilities to substitute (Article 12, Paragraph 1 of the Act).
  3. Notification: when concluding a contract (including a preliminary agreement) that transfers or establishes ownership, or a right aimed at acquiring it, over land or the like within a special monitoring zone, the parties notify in advance of their names and addresses, the location and area, the type of right, the purpose of use, and so on (Article 13, Paragraph 1 of the Act). The size threshold is 200 square meters (Article 4 of the Enforcement Order).

Land or the like that is only in a monitoring zone is not subject to notification.

What to compare

SituationNotificationBasis
Sale, exchange, or gift (including a preliminary agreement) of land or buildings of 200 square meters or more within a special monitoring zoneRequired. Before the contract, from both the seller and the buyerArticle 13, Paragraph 1 of the Act; Article 4 of the Enforcement Order
Within a monitoring zone (not a special monitoring zone)Not requiredCabinet Office, "On Notification"
Transfers not based on a contract, such as inheritance, division of an estate, or a corporate mergerNot requiredSame as above
Leases, establishment of superficies or mortgages, etc.Not required (not a transfer or establishment of ownership etc.)Same as above; Cabinet Office FAQ Q5-11
The party acquiring the right is the national government, a local government, or a corporation specified in the Enforcement OrderNot requiredArticle 13, Paragraph 1 of the Act; Article 5 of the Enforcement Order
Contracts through civil mediation, settlement in litigation, family mediation, or auction (as delinquency disposition, compulsory execution, or enforcement of a security interest)Within 2 weeks from the date the contract is concludedArticle 13, Paragraphs 2 and 3 of the Act; Article 7 of the Enforcement Order

The dividing point

Whether notification is required divides on how the area is counted.

SubjectHow the area is counted
LandPer parcel (judged based on the latest surveyed area)
BuildingsFloor area per building (total of each floor, including annexed buildings)
A unit in a sectionally owned buildingFor the building, the floor area of the exclusive area (common areas are not added). For the land, the total site area × that unit's site-right share

The following are assumptions for illustration.

ExampleCalculationNotification
Exclusive area of 25 square meters, site of 30,000 square meters, site-right share of 50/10,00030,000×50/10,000=150 square metersNot required
The same unit, with a site of 40,000 square meters40,000×50/10,000=200 square metersRequired
An apartment building on 1 parcel of 165 square meters of land, with a building floor area of 220 square metersThe building is 200 square meters or moreRequired
2 parcels of 120 square meters of land (240 square meters in total), no building120 square meters per parcelNot required

Even if the exclusive area is small, in a building with a large site the land side can reach the threshold. This is an easily overlooked point.

Conditions on the numbers

  • The system and zones are as of November 2026, and zones are designated successively by notice. The notification forms were changed on April 1, 2026 (Reiwa 8).
  • Notification is by mail or by electronic application through e-Gov. By mail, it must reach the Cabinet Office by the day before the planned contract date. Email and fax are not accepted.
  • Concluding a contract without notification, failing to notify within 2 weeks, or making a false notification is subject to imprisonment of up to 6 months or a fine of up to ¥1 million (Article 26 of the Act).
  • The Cabinet Office FAQ states that this law does not regulate transactions in land and the like, and that if a proper notification is made, it is fine to conclude the contract. When a notification is made, the Prime Minister conducts a survey of the notified matters (Article 13, Paragraph 4 of the Act). When it is found that a user of the land or the like is using it for, or is clearly likely to use it for, acts that obstruct the functions of an important facility or the like, a recommendation is made after hearing the opinion of a council, and if the measures in the recommendation are not taken without justifiable reason, an order is possible (Article 9 of the Act).
  • In sales in which a licensed real estate broker is involved, this notification is included in the "restrictions based on laws and regulations" in the explanation of important matters (jūyō jikō setsumei) (Article 3, Paragraph 1, Item 64 of the Enforcement Order of the Building Lots and Buildings Transaction Business Act (Takken Gyōhō)). Leases are not included.

The order to check

  1. Check whether the property is inside a special monitoring zone in the Real Estate Information Library (outer boundary lines shown from October 28, 2026) or in the Cabinet Office's list of zones. Near a boundary, check against the zone in the notice.
  2. Count whether it is 200 square meters or more: land per parcel, buildings per building, and for a sectional unit both the exclusive area and "site × site-right share."
  3. Check whether the type of contract is in scope (whether it transfers or establishes ownership etc., and whether it includes a preliminary agreement).
  4. Work back from the planned contract date to set the notification date. Notification is required from both the seller and the buyer (Form 3 if filed jointly; if filed separately, both Form 4 and Form 5).
  5. If there is a broker acting as intermediary, check whether this notification is written in the statement of important matters.

From here on is my opinion

It has become easier to check on a map whether a property is inside a zone. I think the remaining misunderstandings are the land area of a sectional unit and the point that the seller is also a party. I think it is best to treat the notification not as a review that decides whether a transaction may proceed, but as a procedure to build into the contract schedule.

Read a little deeper